United Oil and Gas 2
News
JAM | Sep 14, 2026

United Oil moves closer to possible offshore drilling in Jamaica

/ Our Today

administrator
Reading Time: 3 minutes
United Oil and Gas 1

Search still on for United to find a drilling partner 

Durrant Pate/Contributor

United Oil & Gas has moved one step toward potentially drilling for oil offshore Jamaica, commissioning a study to determine what equipment, costs and logistical support would be required for an exploration well.

The UK-based company has contracted NRG Well Management to examine the availability and cost of offshore drilling rigs, equipment procurement timelines and the supply chain needed to support possible drilling in the Walton-Morant area off Jamaica’s southern coast. The study does not mean drilling has been approved or will definitely take place. 

The latest move follows years of exploration in the Walton-Morant area, where United holds a 100% working interest in a 22,400-square-kilometre offshore block. United estimates that the area could contain more than 7 billion barrels of prospective resources, but that figure does not represent a confirmed oil discovery.

United Oil and Gas 3 Walton-Morant licence
United Oil & Gas Walton-Morant licence in Jamaica

Search still on for drilling partner

However, it is intended to help United prepare for drilling if it secures an investment partner and receives the necessary approvals from the Jamaican Government. The search is still on for United to find a partner to help finance the costly drilling phase of the project. 

United is reporting that its farm-out process — under which another company would invest in the project in exchange for an interest in the offshore license- remains ongoing. It is an estimate based on geological and seismic data, and drilling would be required to determine whether commercially recoverable oil is actually present.

The new study will focus particularly on two potential drilling targets — Colibri and Thunderball. United estimates that Colibri could contain an average prospective resource of about 406 million barrels, while Thunderball could hold about 603 million barrels. 

Together, the two drilling targets have estimated prospective resources of more than 1 billion barrels. NRG will examine which offshore rigs would be suitable for the sites and how much they could cost to operate. Colibri is in water about 750 meters deep, while Thunderball is in significantly deeper water of approximately 1,900 meters.

United Oil and Gas 2

Scope of work for NRG

NRG will also examine how long it would take to obtain specialised drilling equipment and services, as well as potential supply and logistics support from Jamaica, the Gulf of Mexico, Guyana, Suriname and Trinidad. 

United Chief Operating Officer, Donal Meehan, explains, “This drilling study marks an important step in our operational planning to advance the Walton-Morant Licence towards a potential future drilling programme. It will provide a current, market-based assessment of rig suitability, availability, commercial conditions, and the long-lead items required to drill Colibri and Thunderball or similar targets.” 

Continuing, he says, “Colibri and Thunderball represent substantial exploration opportunities within the licence, with a combined potential of over 1 billion barrels of mean prospective resources out of the 7 billion barrels of prospective resources identified on the licence to date. By undertaking this study now, we are positioning the company for operational readiness ahead of future drilling, whilst providing valuable information to support our ongoing work, as we push to conclude the Jamaican farm-out process. We look forward to updating the market with the study results in the coming weeks.”

DSC_4450~2 (1)
Minister of Energy, Transport and Telecommunications, Daryl Vaz, addresses the House of Representatives on Tuesday, July 14, 2026. (Photo: JIS/Michael Sloley)

United said the NRG study is expected to be completed within the coming weeks. Earlier this year, Energy Minister Daryl Vaz expressed cautious optimism about the exploration program after United completed a geochemical survey of the area. 

Preliminary analysis detected C4 and C5 hydrocarbons — butanes and pentanes — in some samples. Minister Vaz cautioned that even if a partner is secured, offshore drilling would likely not take place until late 2027 or 2028. Any drilling would also require the necessary approvals and commercial agreements with the Jamaican Government.

 

Comments

What To Read Next